Study Management FEL 3
Management of the Study phase for FEL 3
Study Criteria (IPD) Procedure
To define the target criteria for successful completion of the Study, specifically level of definition/accuracy for scope, estimate and schedule.
Procedure Number: FEL 3-P-001
Who Performs
Input Required From
Who Approves
Whats Produced
The procedure should be perfomed by
- Project Engineer
The procedure should include input required from
- Design Engineer
- Construction Manager
- Safety Manager
The outputs and processes of the procedure should be approved by
- Project Manager
The procedure should produce the following
- Criteria by which the study will be measured
Steps to take
Key Actions
Tools
Required Deliverables
Step 1
- Review Study Criteria Template
Do this
Go and do the following
Template Study Criteria
Specific Study Criteria
Step 2
- Determine target accuracy levels
Do this
Go and do the following
Step 3
- Review & Approval
Do this
Go and do the following
Step 4
- Measure study outcomes
Do this
Go and do the following
Template measurement tools